Architect for family houses

Your house, from the plot to the keys.

We design it with you, obtain the permit, choose the builders with you and follow the works every week. You always know what comes next, and what it costs.

A new house, in five stages

Sketch

Your needs, the plot, a first design and a budget.

Permit

The application filed, then two months of review for a house.

Builders

Quotes compared on the same specification.

Works

A site meeting every week, minutes sent to you.

Keys

The handover, reservations listed and lifted.

Our houses

Families who live in them today

All our houses

Saint-Cyr-au-Mont-d'Or · 2025

House among the vines

A 142 m² family house on a sloping plot, set into the ground to the north and wide open to the south.

Timber frame, larch cladding, wood fibre insulation11 months on site

Lozanne · 2024

Restored stone farmhouse

A farmhouse brought back to life: lime render, oak joinery and a barn turned into a living room.

Rubble stone, lime render, oak joinery9 months on site

Caluire-et-Cuire · 2025

Glass extension on a 1930s house

A 38 m² kitchen and dining room opening onto the garden, under a building permit.

Steel frame, full-height glazing, reclaimed brick6 months on site

Lyon 6e · 2024

Flat in an old building

A 95 m² flat redrawn around its original fireplaces: one corridor fewer, one bedroom more.

Oak parquet, lime plaster, made-to-measure joinery4 months on site

Before you call

The questions every family asks us

Do we have to use an architect?

For a building permit, yes, unless you build for yourselves 150 m² of floor area or less. An extension that takes the house beyond 150 m² counts too.

How are your fees set?

In a written contract, signed before any drawing: a fixed price for short missions, a percentage of the works for a full mission, broken down stage by stage.

How long before the works start?

Count a few weeks of design, two months of review for the permit of a house, then two months during which neighbours can appeal once the permit is displayed.

What protects us if something goes wrong?

The architect carries compulsory professional insurance and answers for ten years for damage that threatens the building. You take out the building damage insurance before the works start.

Can we stop along the way?

Yes. Each stage is validated in writing, and you only pay for what has been done.

In their new house

We had never built anything. At every meeting we knew what had been decided and what came next.
Claire and Mathieu D.New house, Saint-Cyr-au-Mont-d'Or
The builders' quotes were compared line by line. The savings paid for the terrace.
Sonia and Karim B.New house, Tassin-la-Demi-Lune
Three children, one bathroom: the extension solved it, and the permit came through without a hitch.
Romain T.Extension, Caluire-et-Cuire

Tell us about your house

A few lines are enough to start. We reply within two working days to arrange a first meeting, on the plot or at the studio.

Rather talk it through?

04 78 00 11 22